WP1D1.1 Provision of storage and curation of dataLead partner Polimi (Italy) - completed on 20/03/2017 D1.2 Report on New Sub-Gaussian ModelsLead partner Polimi (Italy) - completed on 20/03/2017 D1.3 Software to generate unconditional and conditional sub-Gaussian fieldsLead partner Polimi (Italy) - completed on 20/10/2017 D1.4a Report on characterization of field sites (preliminary characterization)Lead partner Polimi (Italy) - completed on 20/10/2017. The final characterization (D1.4b) is expected to be completed by Oct 2018 D1.4b Report on characterization of field sitesLead partner Polimi (Italy) - completed on 20/11/2018
WP2D2.1 Report on particle tracking methods for complex non-linear problemsLead partner UPC (Spain) - completed on 20/10/2017 D2.2 Report on groundwater flow and transport on the two field sitesLead partner UPC (Spain) - completed on 20/11/2018 D2.3 Report on probabilistic time related protection zones of the two field sitesLead partner UPC (Spain) - completed on 20/07/2019
WP3D3.1 Detection and Characterization protocols of selected ECsLead partner Weizmann (Israel) - completed on 01/05/2017 D3.2 Application of the analytical methods of selected ECs in complex matrices, including sample preparationLead partner Weizmann (Israel) - completed on 24/09/2017 D3.3a Report on transport experiments including modeling and analysisLead partner Weizmann (Israel) - completed on 15/04/2018 D3.4 Report on the analysis of selected ECs at field sitesLead partner Weizmann (Israel) - completed on 18/11/2018 D3.3b Report on transport experiments including modeling and analysisLead partner Weizmann (Israel) - completed on 30/04/2019
WP4D4.1 Report on EC toxicities from bibliography and laboratory experimentsLead partner UAVR (Portugal) - completed on 20/03/2017 D4.2 Report on the toxicity of samples from the two field sitesLead partner UAVR (Portugal) - completed on 20/10/2017 D4.3 Report on the mixture approach used for the study areasLead partner UAVR (Portugal) - completed on 20/07/2019
WP5D5.1 Report on groundwater risk management modelLead partner Polimi (Italy) - completed on 20/06/2018 D5.2 Report on the application of the risk model to the field sitesLead partner Polimi (Italy) - completed on 20/07/2019
|